Site construction operation method of fiber fusion

Site construction operation method of fiber fusion

The first step in splicing the fiber is to install a fusible protective cover and then place it in the correct fused position after the fiber stripping and splitting to produce a cross section. The fusion needs to ensure that the end faces of the two fibers have a suitable coaxial position protect the fiber, close the door. The operator then transfers the fiber to the appropriate location, ready to weld and ignite. After welding, some fusion splicer can also be a brief test of the welding point. And then remove the fiber, the protective sleeve slide to the welding point position, the protective cover to heat, resulting in heat shrink, protect the cable. The operator needs to spend a lot of time to confirm the fiber position and protect the casing.
Welding machine also need to provide power, but some AC power can not receive the case, some welding machine can use one of the backup battery. Usually these battery packs can provide 2 to 3 hours of power required, depending on the manufacturer, and the battery can be recharged.
Operating the fiber splicer is not complicated, but it is not as simple as it is easy to operate the pre-milled connector. When operating the pre-milled connector, the operator can stand on the ladder, head the probe into the ceiling, and successfully connect the pre-milled connector in a dim environment, even in extremely difficult environments, The operation can also be done very well. But remember: not all fiber termination will have good operating conditions.
The fiber splicer has a number of different procedures that allow for the processing of different fibers. The program has some variable parameters, including length, time, processing time for the protective sleeve, and processing temperature. These programs can be easily stored in memory for use when necessary.

Share this post